Send Message
Henan Zonghai Plastic Industry Co., Ltd.
products
products
Home > products > Pre Pressurized Water Tank > Large Medium Small Pressurized Water Tank System For Industrial Residential

Large Medium Small Pressurized Water Tank System For Industrial Residential

Product Details

Brand Name: Zonghai

Certification: ISO9001

Model Number: Pre Pressurized Water Tank

Payment & Shipping Terms

Minimum Order Quantity: 1 Set

Price: 220-369 USD

Packaging Details: Single Item

Delivery Time: 7-30 Working Days

Payment Terms: T/T

Supply Ability: 50 Sets/Week

Get Best Price
Highlight:

Industrial Pressurized Water Tank System

,

Residential Pressurized Water Tank System

,

Medium Pressurized Water Tank System

Material:
High-strength PVC Coated Fabric
Shape:
Cylindrical, Rectangular, Pillow Shaped
Color:
Blue Or Customized
Warranty:
1 Year
Capacity:
50-15000 Gallons
Application:
Roadbeds And Bridges Construction Sites
Material:
High-strength PVC Coated Fabric
Shape:
Cylindrical, Rectangular, Pillow Shaped
Color:
Blue Or Customized
Warranty:
1 Year
Capacity:
50-15000 Gallons
Application:
Roadbeds And Bridges Construction Sites
Large Medium Small Pressurized Water Tank System For Industrial Residential

Product Description:

When it comes to the construction of railway and highway bridges, preloading testing plays a crucial role in ensuring the safety of the bridge structures. In the traditional method, preloading sandbags are used, but they come with challenges such as handling difficulties, cumbersome operation, and high costs.


Our Pre pressure flexible tank offers a solution to these issues by utilizing condensation force, resulting in exceptional anti-swelling strength. Once filled with water, this flexible tank can provide the necessary weight, effectively replacing the traditional sandbag preloading method.


The Pre pressure flexible tank has emerged as an ideal choice for modern bridge construction, offering a more efficient and cost-effective alternative to traditional practices.

Features:

1. Easy to Transport: When the bag is empty, it is lightweight and easy to transport and handle, greatly reducing labor costs.

2. Easy to Operate: Simply inject water to use, no need for complex equipment or technology, saving time and manpower.

3. Time and Effort Saving: Rapid water injection and drainage significantly improve construction efficiency and shorten the construction period.

4. Accurate Testing: Evenly distribute weight to ensure accurate and reliable preloading test data.

5. Low Cost: Reusable, reducing material waste, and more economical for long-term use.

6. Reusable: High strength PVC material has strong durability and can be used multiple times, suitable for long-term project needs.

7. Safe and Reliable: High tensile strength, not easily broken, ensuring construction safety.

8. Environmental Innovation:  Replacing traditional sandbags, reducing environmental pollution, and in line with modern environmental construction concepts.

Applications:

Railway bridge construction requires bridge preloading testing to ensure the structural stability of the bridge. This testing is crucial for assessing the performance of the bridge and identifying any potential issues that may affect its stability during use.

In highway and bridge construction projects, sandbags can be replaced with more efficient and cost-effective preloading solutions. These solutions help to expedite the construction process and provide a reliable method for ensuring the stability and safety of the structures being built.

For other large-scale construction projects, such as elevated bridges and overpasses, similar preloading techniques can be applied to enhance structural stability and performance. These methods help to validate the strength and durability of the structures, ensuring their safety and longevity.