Send Message
Henan Zonghai Plastic Industry Co., Ltd.
products
products
Home > products > Pre Pressurized Water Tank > Blue Water System Pressure Tank Foldable For Roadbeds And Bridges Construction Sites

Blue Water System Pressure Tank Foldable For Roadbeds And Bridges Construction Sites

Product Details

Brand Name: Zonghai

Certification: ISO9001

Model Number: Pre Pressurized Water Tank

Payment & Shipping Terms

Minimum Order Quantity: 1 Set

Price: 220-369 USD

Packaging Details: Single Item

Delivery Time: 7-30 Working Days

Payment Terms: T/T

Supply Ability: 50 Sets/Week

Get Best Price
Highlight:

Foldable Water System Pressure Tank

,

Roadbeds Water System Pressure Tank

,

Bridges Foldable Water Tank

Features:
Flexible, Foldable, And Easy To Transport And Install
Material:
High-strength PVC Coated Fabric
Thickness:
0.85mm-1.5mm
Capacity:
1000L-100000L
Color:
Blue Or Customized
Usage:
Bridge Construction For Railways And Highways
Application:
Roadbeds And Bridges Construction Sites
Warranty:
1 Years
Features:
Flexible, Foldable, And Easy To Transport And Install
Material:
High-strength PVC Coated Fabric
Thickness:
0.85mm-1.5mm
Capacity:
1000L-100000L
Color:
Blue Or Customized
Usage:
Bridge Construction For Railways And Highways
Application:
Roadbeds And Bridges Construction Sites
Warranty:
1 Years
Blue Water System Pressure Tank Foldable For Roadbeds And Bridges Construction Sites

Water System Pressure Tank Foldable Roadbeds And Bridges Construction Sites Blue Water Pressure Tank

Product Description:

In the realm of railway and highway bridge construction, preloading testing stands as a crucial step to guarantee the safety of bridge structures. The conventional approach of utilizing sandbags for preloading encounters issues such as handling difficulty, cumbersome operation, and high expenses. Our innovative Pre pressure flexible tank, fashioned via condensation force, exhibits remarkable anti-swelling potency. Upon water filling, it garners ample weight, seamlessly supplanting traditional sandbag preloading methods, thereby emerging as a supreme choice for contemporary bridge construction.


Features:

Easy to transport: When the bag is empty, it is lightweight and easy to transport and handle, greatly reducing labor costs.

Easy to operate: Simply inject water to use, no need for complex equipment or technology, saving time and manpower.

Time and effort saving: Rapid water injection and drainage significantly improve construction efficiency and shorten the construction period.

Accurate testing: Evenly distribute weight to ensure accurate and reliable preloading test data.

Low cost: Reusable, reducing material waste, and more economical for long-term use.

Reusable: High strength PVC material has strong durability and can be used multiple times, suitable for long-term project needs.

Safe and reliable: High tensile strength, not easily broken, ensuring construction safety.

Environmental innovation: Replacing traditional sandbags, reducing environmental pollution, and in line with modern environmental construction concepts.


Comparison with traditional sandbag preloading:

Efficiency: Traditional sandbag handling is time-consuming and labor-intensive, and water bags can be filled with water to use, resulting in higher efficiency.

Cost: Sandbags are disposable and have a high cost; The water bag can be reused, making it more cost-effective in the long run.

Environmental friendliness: Sandbags are prone to generating waste, while water bags are environmentally friendly and reusable.

Safety: The water bag has high anti-swelling strength, is not easy to break, and is safer to construct.


Applications:

Railway Bridge Construction: This method is utilized for conducting bridge preloading tests to guarantee the structural stability of the bridge.

Highway and Bridge Construction: By replacing sandbags, we offer efficient and cost-effective preloading solutions for highway and bridge construction projects.

Other Large-Scale Construction Projects: This technique can also be applied in other significant construction undertakings such as elevated bridges, overpasses, and more.