Product Details
Brand Name: Zonghai
Certification: ISO9001
Model Number: Pre Pressurized Water Tank
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: 220-369 USD
Packaging Details: Single Item
Delivery Time: 7-30 Working Days
Payment Terms: T/T
Supply Ability: 50 Sets/Week
Material: |
High-strength PVC Coated Fabric |
Color: |
Blue Or Customized |
Capacity: |
50-15000 Gallons |
Shape: |
Cylindrical, Rectangular, Pillow Shaped |
Application: |
Roadbeds And Bridges Construction Sites |
Warranty: |
1 Year |
Material: |
High-strength PVC Coated Fabric |
Color: |
Blue Or Customized |
Capacity: |
50-15000 Gallons |
Shape: |
Cylindrical, Rectangular, Pillow Shaped |
Application: |
Roadbeds And Bridges Construction Sites |
Warranty: |
1 Year |
In the construction of railway and highway bridges, preloading testing is a crucial step to ensure the safety of bridge structures. The conventional practice of using sandbags for preloading presents various challenges, including handling difficulties, cumbersome operations, and high costs.
Fortunately, our Pre pressure flexible tank offers a solution to these issues. Utilizing condensation force during processing, it boasts exceptional anti-swelling strength. Once filled with water, it acquires sufficient weight and effectively supersedes the use of traditional sandbags for preloading.
This innovative solution has quickly emerged as a favored option for modern bridge construction projects, thanks to its superior performance and cost-effectiveness.
Efficient Construction: Our bridge pre-pressure water tank offers a significant improvement in the efficiency of preloading testing, resulting in a shorter construction period.
Reduce Costs: By choosing our water tank, you can reduce labor, material, and time costs, ultimately enhancing the economic benefits of your project.
Environmental Safety: Our tank complies with modern environmental construction standards, ensuring a safe and reliable construction process.
Railway Bridge Construction: This method is utilized for conducting bridge preloading testing to guarantee the structural stability of the bridge.
Highway and Bridge Construction: Here, sandbags are substituted with efficient and cost-effective preloading solutions to enhance the construction process.
Other Large-Scale Construction Projects: This technique can also be applied in the construction of significant structures like elevated bridges, overpasses, and more.