Product Details
Brand Name: Zonghai
Certification: ISO9001; CE
Model Number: HDPE Geomembrane Liners
Payment & Shipping Terms
Minimum Order Quantity: 500 Square Meters
Price: 0.6-1.5 USD/Square Meter
Packaging Details: Single Item
Delivery Time: 7-30 Working Days
Payment Terms: T/T
Supply Ability: 2000 Square Meters/Day
Color: |
Black, Green |
Material: |
High Density Polyethylene (HDPE) |
Chemical Resistance: |
Excellent Resistance To Acids, Alkalis, And Other Chemicals |
Width: |
1m - 20m |
Tear Resistance: |
≥ 100N |
Tensile Strength: |
≥ 25MPa |
Length: |
50m - 200m |
Temperature Resistance: |
-70°C To 70°C |
Color: |
Black, Green |
Material: |
High Density Polyethylene (HDPE) |
Chemical Resistance: |
Excellent Resistance To Acids, Alkalis, And Other Chemicals |
Width: |
1m - 20m |
Tear Resistance: |
≥ 100N |
Tensile Strength: |
≥ 25MPa |
Length: |
50m - 200m |
Temperature Resistance: |
-70°C To 70°C |
HDPE Geomembrane Liner: A groundbreaking product specifically developed for the containment of liquids on a large, medium, and small scale, the HDPE geomembrane liner is ideal for holding a wide range of liquids such as water, chemicals, and waste. Crafted from durable PVC material, the installation process is streamlined, requiring only the placement of the impermeable membrane in the soil pit.
Benefits Comparison: When compared to traditional brick and concrete tanks, the HDPE geomembrane liner offers significant advantages in terms of cost savings, time efficiency, and labor reduction. This makes it a top choice for liquid storage needs, delivering an efficient and effective solution for various applications.
1. Using high-strength PVC material with excellent anti-seepage performance, ensuring no liquid leakage.
2. Suitable for storage needs of various liquids such as water, chemical liquids, and waste liquids.
1. Just dig the soil pit, measure the on-site dimensions, customize the factory 1:1 production, and ship it to the site for laying.
2. No need for complex construction equipment or technology, saving time and labor costs.
1. Compared to traditional brick concrete pool structures, it has lower costs and shorter construction periods.
2. Reusable, low maintenance cost, and more economical for long-term use.
1. Customize production according to on-site dimensions and requirements, perfectly adapting to various venues.
2. Suitable for large, medium, and small liquid storage projects, meeting diverse needs.
Cost: The construction cost of brick concrete pool is high, while HDPE geomembrane liner is economical.
Construction period: The construction of the brick concrete pool is complex and time-consuming, while the HDPE geomembrane liner is quickly laid, saving time.
Flexibility: The brick concrete pool body is fixed and cannot be moved, while the HDPE geomembrane liner can be customized and reused.
Maintenance: The brick concrete pool body is prone to leakage and requires frequent maintenance, while the HDPE geomembrane liner is durable and maintenance free.